So what exactly did Ghori reveal on Relentless? Well, he seemed to tip off the possibility that xAI has been skirting regulations and getting dubious permits when building data centers—specifically, its prized Colossus supercomputer in Memphis, Tennessee. “The lease for the land itself was actually technically temporary. It was the fastest way to get the permitting through and actually start building things,” he said. “I assume that it’ll be permanent at some point, but it’s a very short-term lease at the moment, technically, for all the data centers. It’s the fastest way to get things done.”

When asked how xAI has gone about getting those temporary leases, Ghori explained that they worked with local and state governments to get permits that allow companies to “modify this ground temporarily,” and said they are typically for things like carnivals.

Colossus was not without controversy already. The data center, which xAI brags only took 122 days to build, was powered by at least 35 methane gas turbines that the company reportedly didn’t have the permits to operate. Even the Donald Trump-staffed Environmental Protection Agency declared the turbines to be illegal. Those turbines, which were operating without permission, contributed to the significant amount of air pollution experienced by surrounding communities.

In addition to the indication of other potential legal end-arounds committed by xAI, Ghori also revealed some of the company’s internal operations, including relying significantly on AI agents to complete work. “Right now, we’re doing a big rebuild of our core production APIs. It’s being done by one person with like 20 agents,” he said. “And they’re very good, and they’re capable of doing it, and it’s working well,” though he later stated that the reliance on agents can lead to confusion. “Multiple times I’ve gotten a ping saying, ‘Hey, this guy on the org chart reports to you. Is he not in today or something?’ And it’s an AI. It’s a virtual employee.”

  • bamboo@lemmy.blahaj.zone
    link
    fedilink
    English
    arrow-up
    6
    ·
    6 hours ago

    They’re probably not even building to industry standards and not properly grounding their equipment, so if you were to visit the “datacenter” you’d be literally shocked.