“is usually written by an over worked engineer”
I’m in this post and I don’t like it.
But really these scada systems are rarely well defined by the time implementation happens. Often the architect has a great plan, but by the time it’s passed to a manager, a non-software engineer, to the product engineer to the automation team to the contractor the end result is “X data is pushed in With Y form and we use either a,b,or c date time stamp any nobody knows”
Good luck on the thesis and I hope my data points can assist your research! I’m sure the community would love to see your finished thesis when it is done