• artyom@piefed.social
    link
    fedilink
    English
    arrow-up
    5
    ·
    edit-2
    1 hour ago

    Basically made a really sturdy pergola and then mounted solar panels to it. Ran that wiring to the MPPT, batteries and inverter in the garage. Put in a new small breaker box right next to the existing one, which made it real easy to just grab the wires for the critical loads and run them over to the new panel.

    No need to worry about backfeeding, as I said they’re parallel electrical systems, so it’s not possible.